[1] COWARDIN H M.Orbital Debris Quarterly News[J].Orbital Debris Quarterly News,2023,27(1):12.
[2] LIU J,JIANG H,YANG X,et al.Space debris research progress of China[J].Chinese Journal of Space Science,2020,40(5):956-961.
[3] 杨臣威,姜鹏,贾明皓,等.中国南极昆仑站低轨空间碎片监测优势及CSTAR望远镜实测[J].极地研究,2019,31(2):128-133.
[4] 汤靖师,程昊文.空间碎片问题的起源、现状和发展[J].物理,2021,50(5):317-323.
[5] MARK C P,KAMATH S.Review of active space debris removal methods[J].Space Policy,2019,47:194-206.
[6] HOSSEIN S H,ACERNESE M,CARDONA T,et al.Sapienza Space debris Observatory Network(SSON):A high coverage infrastructure for space debris monitoring[J].Journal of Space Safety Engineering,2020,7(1):30-37.
[7] SUCHODOLSKI T.Active control loop of the BOROWIEC SLR space debris tracking system[J].Sensors,2022,22(6):2231.
[8] LUO Q,ZHAO L,YU C,et al.Cost-efficient scheduling of FAST observations[J].Experimental Astronomy,2018,45:107-126.
[9] HOTAN A W,BUNTON J D,CHIPPENDALE A P,et al.Australian square kilometre array pathfinder:I.system description[J].Publications of the Astronomical Society of Australia,2021,38:e009.
[10] KANSABANIK D,OBEROI D,MONDAL S.Tackling the unique challenges of low-frequency solar polarimetry with the Square Kilometre Array Low Precursor:the algorithm[J].The Astrophysical Journal,2022,932(2):110.
[11] WANG L,PAN Z,WANG J.A review of reinforcement learning based intelligent optimization for manufacturing scheduling[J].Complex System Modeling and Simulation,2021,1(4):257-270.
[12] 王歆,陆昊,赵海斌,等.基于0-1线性规划的近地天体望远镜巡天调度优化[J].天文学报,2015,56(04):391-398.
[13] JOHNSTON M D.Automated telescope scheduling[M].Cambridge University Press,Cambridge UK,1988.
[14] SABOL A,ALIMO R,KAMANGAR F,et al.Deep space network scheduling via mixed-integer linear programming[J].IEEE Access,2021,9:39985-39994.
[15] CLAUDET T,ALIMO R,GOH E,et al.Δ-MILP:deep space network scheduling via mixed-integer linear programming[J].IEEE Access,2022,10:41330-41340.
[16] 戴伟,卫冰涛,郝龙飞,等.基于线性规划的云南40米射电望远镜短期观测编排方法[J].天文研究与技术,2022,19(03):221-226.
[17] YÁÑEA J.Optimization of telescope scheduling-Algorithmic research and scientific policy[J].Astronomy & Astrophysics,2003,403(1):357-367.
[18] 刘琪.丽江2.4米光学望远镜观测时间自动分配算法研究[D].天津:天津大学,2015.
[19] 尹树成.面向天文望远镜调度的多目标优化[D].天津大学,2017.
[20] SHALCHIAN H,SOTOUDEH M H,KHOSROSHAHI H G,et al.A metaheuristic approach for INO340 telescope flexible scheduling[C].Software and Cyberinfrastructure for Astronomy VII.SPIE,2022,12189:117-132.
[21] WEI S,WEI B,CHEN Y,et al.Time-dependent short-term observational scheduling method for Yunnan 40 m Radio Telescope using a genetic algorithm[J].Astrophysics and Space Science,2022,367(9):97.
[22] GIULIANO M E,JOHNSTON M D.Multi-objective evolutionary algorithms for scheduling the James Webb Space Telescope[C].ICAPS.2008:107-115.
[23] LIU Y,ZHANG S,HU H.A conflict avoidance algorithm for space-based collaborative stereo observation mission scheduling of space debris[J].Advances in Space Research,2022,70(8):2302-2314.
[24] SONG T,WANG W,LI D,et al.An optimal resource scheduling of debris monitoring using particle swarm algorithm with constriction factor[C].2021 8th International Conference on Dependable Systems and Their Applications(DSA).IEEE,2021:444-450.
[25] ZHAO M,LI D,ZHANG L,et al.Optimization scheduling design of monitoring resources using a process-improved adaptive genetic algorithm[C].2021 7th International Symposium on System and Software Reliability(ISSSR).IEEE,2021:167-177.
[26] LÓPEZ-CASADO C,PÉREZ-DEL-PULGAR C,MUÑOZV F,et al.Observation scheduling and simulation in a global telescope network[J].Future Generation Computer Systems,2019,95:116-125.
[27] ZHANG Y,YU C,SUN C,et al.A Multilevel scheduling framework for distributed time-domain large-area sky survey telescope array[J].The Astronomical Journal,2023,165(3):77.
[28] 李凯文,张涛,王锐,等.基于深度强化学习的组合优化研究进展[J].自动化学报,2021,47(11):2521-2537.
[29] JIA Q,JIA P,LIU J.Optimal control of wide field small aperture telescope arrays with reinforcement learning[C].Observatory Operations:Strategies,Processes,and Systems IX.SPIE,2022,12186:170-177.
[30] JIA P,JIA Q,JIANG T,et al.A simulation framework for telescope array and its application in distributed reinforcement learning-based scheduling of telescope arrays[J].Astronomy and Computing,2023:100732.
[31] JOHNSTON M D,MILLER G.Spike:Intelligent scheduling of hubble space telescope observa-tions[J].Intelligent Scheduling,1994:391-422.
[32] 唐鹏毅.南极多色测光太阳望远镜自主观测控制系统研究[D].中国科学技术大学,2017.
[33] SHETRONE M,CORNELL M E,FOWLER J R,et al.Ten year review of queue scheduling of the Hobby-Eberly Telescope[J].Publications of the Astronomical Society of the Pacific,2007,119(855):556.
[34] SUTHERLAND W,EMERSON J,DALTON G,et al.The visible and infrared survey telescope for astronomy(VISTA):design,technical overview,and performance[J].Astronomy & Astrophysics,2015,575:A25.
[35] DYER M J,DHILLON V S,LITTLEFAIR S,et al.A telescope control and scheduling system for the Gravitational-wave Optical Transient Observer(GOTO)[C].Observatory Operations:Strategies,Processes,and Systems VII.SPIE,2018,10704:124-137.
[36] BEKHTI Y A,LAMRAOUI K,SEGHOUANI N,et al.A scheduler for the National Aures Observatory[C].Journal of Physics:Conference Series.IOP Publishing,2019,1269(1):012004.
[37] 李曼迪,葛亮,姜晓军.望远镜观测调度系统研究进展[J].天文学进展,2019,37(4):455-468.
[38] 李建,崔辰州,赵永恒,等.基于RTS2的RAO管理系统二次开发[J].天文研究与技术,2013,10(3):264-272.
[39] ZHANG G,WANG J,TANG P,et al.An autonomous observation and control system based on EPICS and RTS2 for Antarctic telescopes[J].Monthly Notices of the Royal Astronomical Society,2016,455(2):1654-1664.
[40] SUN T,LI X,HU L,et al.Antarctic Survey Telescope 3-3:Overview,System Performance and Preliminary Observations at Yaoan,Yunnan[J].Universe,2022,8(6):303.
[41] ZHANG Y J,YU C,SUN C,et al.A Multilevel Scheduling Framework for Dis-tributed Time-domain Large-area Sky Survey Telescope Array[J].The Astronomical Journal,2023,165(3).
[42] GOH E,VENKATARAM H S,HOFFMANN M,et al.Scheduling the NASA deep space network with deep reinforcement learning[C].2021 IEEE Aerospace Conference(50100).IEEE,2021:1-10.